At Astech Group, we don’t do one-size-fits-all. We deliver practical, high-performance waste solutions built around what our clients really need. A recent project in Western NSW is a great example, where we worked with a local waste contractor to support a major mine site with a fully customised bin setup.

The Challenge: No Front-Lift Truck? No Problem.
The client needed a mix of hook-lift and front-lift bins to manage the mine’s solid waste. However, there was a hitch, they didn’t have a front-lift truck. We engineered a clever fix: a modified 3m front-lift bin that merged skip and front-lift features, custom-built to work with the equipment available.
Key Deliverables:
- Fifteen 15m³ hook-lift bins
- Custom-designed 3m hybrid front-lift bins
These bins were designed from the ground up to withstand the heavy-duty wear typical of a mining environment.
Built for the Tough Stuff
Mining environments are rough on gear, so we made sure these bins could handle it. We even reprogrammed our robotic welding system to ensure the new bin design met the site’s structural and operational requirements.
The end result? Strong, reliable bins that worked from the moment they hit the ground.
Fast Turnaround, Smooth Delivery
From the first conversation to full delivery on-site, the project was wrapped up in just 6–7 weeks. We used our own trucks and brought in extra transport to speed up the delivery schedule. Despite the remote location and strict mine access regulations, our team delivered on time, hassle-free.
What It Meant for the Client
The bins have proven easy to handle and efficient to use—key factors in a mining environment where downtime is costly. The client was impressed not just by the product, but by our proactive service. They’ve since placed further orders, strengthening an already productive partnership.
Why This Project Stands Out
- Custom Design, Fast Turnaround
- Smart Logistics with On-Time Delivery
- Site-Compliant and Built for Harsh Conditions
- Repeat Orders from a Satisfied Client
Ready to Solve Your Waste Challenges?
Whether you’re managing a mine, industrial site or regional council programme, Astech Group is ready to help. Get in touch today to discover how we can build the right solution for your environment.
Why Choose Astech Group?
Choosing Astech Group means partnering with a leading manufacturer of premium waste and recycling equipment. We’ve been supplying the industry for years, earning a reputation for unwavering quality and service.
DURA QUALITY
Our team of trained professionals delivers bins that meet real-world demands. We invest in people and processes to ensure every product is built to a high standard—every time.
DURA SERVICE
With three facilities across NSW and Australia-wide delivery, we make sure your bins arrive on time, in top condition, and ready to work.
DURA PRICE
We offer consistently competitive products, achieved by investing in technology to create manufacturing savings. We aim for continuous improvement in product quality and customer satisfaction.














